published:27.05.2025.
Our team performed flushing, degreasing, and passivation on 200 meters of DN500 steam pipeline, reaching elevations of up to 70 meters. To meet the demands of the system, we used high-capacity, chemical-resistant pumps, ensuring safe and efficient circulation throughout the process.
The scope also included safe waste collection and disposal, ensuring full environmental compliance.
All works were completed within one week, thanks to precise planning, skilled execution, and strong collaboration on site.
Proud of our team for delivering high-quality results in demanding conditions!